Skip to site content Skip to main menu

Tell us whether you accept cookies

Published: 25 July 2023

Identification of Reinforced Autoclaved Aerated Concrete (RAAC) in the police estate - 9 May 2023

Category: Reports
Topic: Estate

Report Summary

This report provides members of the Resources Committee with an overview of Identification of Reinforced Autoclaved Aerated Concrete (RAAC) in the police estate.

To access the full document please open the PDF document above.

To view as accessible content please use the sections below. (Note that tables and some appendixes are not available as accessible content). 

Meeting

The publication discussed was referenced in the meeting below

Resources Committee - 9 May 2023

Date : 09 May 2023

Location : online


Background

The Police Scotland estates team became aware that RAAC was in the roof of the Fettes (Edinburgh) fleet workshop during repair works on 6 April 2023. As a result, structural engineers were brought in to assess the condition of the RAAC in the workshop as well as to inspect the rest of the Fettes complex for the presence of RAAC.

By way of background, RAAC planks are light-weight concrete, which differs from normal dense concrete (approx. 30-40% lighter in weight) and is more commonly found in buildings constructed from 1956 until the 1990's. These planks were generally used in roof work, walls and flooring and can be subject to degeneration over time, exacerbated by weathering i.e. water ingress whereby the concrete absorbs the water, creating a crumbling effect over time. RAAC was widely used in construction right across the UK and as it reaches the end of its useful life, it presents an issue to public and private sector bodies across the board.

The current guidance was recently updated, whereby the recommendation has been given to identify, monitor, risk manage and replace planks where appropriate. The risks are assessed in a red, amber, green traffic light system with red being the highest priority; either red high or red critical.

The workshop in Fettes was assessed as a red high risk requiring immediate attention with approximately 75% of the RAAC planks in this category. As a result the workshop was closed and the business continuity plan was put in place, which has been working effectively. The detailed inspection of the rest of Fettes confirmed further RAAC present in a number of other areas, and these too have been closed off with business continuity arrangements put in place.


Related Publications

The documents below are related by Topic and are the most recently published

Green icons showing 7 inter-connected circles.

Estates Masterplan - 26 September 2024

Published: 01 October 2024

Estate

Green icon showing weighing scales.

Estates Continuous Improvement Initiatives Update and Next Steps - 19 June 2024

Published: 17 June 2024

Estate

Green icon showing weighing scales.

Estates Transformation Engagement Overview and Update - 13 March 2024

Published: 19 March 2024

Estate

Green icon of concurrent circles with an arrowing pointing to the middle.

HMICS Custody Inspections-Lanarkshire and Tayside Improvement Plans - 6 December 2023

Published: 13 December 2023

Estate